
Based upon a structural analysis review of the bridge, INDOT has determined that vehicles weighing over 38-tons are not allowed to travel on this bridge. Signs displaying “Weight Limit 38 Tons” are posted on both sides of the bridge.
INDOT has activated a traffic signal to allow for motorists to travel in one direction at a time across the bridge.
INDOT has a project to repair the bridge scheduled to open for bids in January of next year.